Do you have a specific analysis request? Do you need advice? Write to us or call us. We will send you a custom offer, including the price, by return.
Suitable for
- Construction and water management companies
- Waste management companies
- The use of soil and construction material for backfilling at a construction site or removal from a construction site
Analysis options
- Table 5.1, 5.2 and 5.3 of Decree 273/2021
- The landfilling of soil and construction material (analysis pursuant to Decree 273/2021 table 10.1)
Determines (pursuant to Decree 273/2021)
- Dry matter parameters (table 5.1)
- Inorganic parameters – metals (As, Ba, Be, Cd, Cr, Cu, Hg, Ni, Pb, V, Zn)
- Organic parameters – benzene, polycyclic aromatic hydrocarbons, polychlorinated biphenyls, C10-C40 hydrocarbons, EOX
- Leachate parameters (table 5.2)
- Inorganic parameters – chlorides, fluorides, sulphates, solutes, metals (As, Ba, Cd, Cr, Cu, Hg, Ni, Pb, Zn, Mo, Sb, Se)
- Organic parameters – DOC, monohydric phenols
- Acute toxicity (table 5.3)
- Inhibition of bacteria (Aliivibrio fischeri) light emission, immobilization of Daphnia magna Straus, inhibition of algal growth (Desmodesmus subspicatus), inhibition of root growth of higher plants (Lactuca sativa)
Analysis duration: usually seven to ten/fifteen business days
Additional information
- Backfilling
- Pursuant to Decree 273/2021, on the details of waste management, table 5.1 (dry matter), 5.2 (leachate) and 5.3 (ecotoxicity)
- Column I (stricter) and II (less strict)
- Landfilling
- The first choice if you know that the excavated soil is contaminated
- The decree requires sampling by a qualified person (however some landfills and depots do not require this)
- Analysis pursuant to Decree 273/2021, on the details of waste management, table 10.1